Skip to content Skip to sidebar Skip to footer

[Download] "Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)" by The Law Library # eBook PDF Kindle ePub Free

Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)

📘 Read Now     📥 Download


eBook details

  • Title: Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)
  • Author : The Law Library
  • Release Date : January 08, 2018
  • Genre: Law,Books,Professional & Technical,
  • Pages : * pages
  • Size : 1090 KB

Description

The Law Library presents the complete text of the Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition).
Updated as of May 29, 2018

The Federal Energy Regulatory Commission is amending the transmission planning and cost allocation requirements established in Order No. 890 to ensure that Commission-jurisdictional services are provided at just and reasonable rates and on a basis that is just and reasonable and not unduly discriminatory or preferential. With respect to transmission planning, this Final Rule requires that each public utility transmission provider participate in a regional transmission planning process that produces a regional transmission plan; requires that each public utility transmission provider amend its OATT to describe procedures that provide for the consideration of transmission needs driven by public policy requirements in the local and regional transmission planning processes; removes from Commission-approved tariffs and agreements a federal right of first refusal for certain new transmission facilities; and improves coordination between neighboring transmission planning regions for new interregional transmission facilities. Also, this Final Rule requires that each public utility transmission provider must participate in a regional transmission planning process that has: A regional cost allocation method for the cost of new transmission facilities selected in a regional transmission plan for purposes of cost allocation; and an interregional cost allocation method for the cost of certain new transmission facilities that are located in two or more neighboring transmission planning regions and are jointly evaluated by the regions in the interregional transmission coordination procedures required by this Final Rule. Each cost allocation method must satisfy six cost allocation principles.

This ebook contains:
- The complete text of the Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)
- A dynamic table of content linking to each section
- A table of contents in introduction presenting a general overview of the structure


Download Books "Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)" PDF ePub Kindle